outline-mcp
User Guides

User Guide Overview

A complete operational guide for setup, rollout, day-2 operations, and troubleshooting.

This section is your practical runbook for operating outline-mcp.

Each page is written so a team can move from first setup to controlled production use without guessing hidden behavior.

How to use this section

Use this section in phases.

Phase 1: Connect and validate

Phase 2: Define safety boundaries

Phase 3: Operate at scale

First-week rollout plan

A practical first-week plan usually looks like this:

  1. Start one client in read mode and validate discovery/read paths.
  2. Enable read,write for a controlled workspace and validate update patterns.
  3. Introduce safe update and lease patterns for concurrent agents.
  4. Enable delete paths only after your lifecycle policy is approved.
  5. Add CI validation with optional E2E for regression protection.

Following this sequence reduces risk while still moving quickly.